The GTF 250 mounted on the new three-axle truck paired with the GTF 400 completed an important project on the A22 Modena Brennero. The job took place in the 420 m long Brenner tunnel, the last tunnel before the Italian-Austrian border.
Special Machines and Equipment is the new division of Grotti srl focused on the construction of machines and equipment or modifications to pre-existing machines to meet customers’ specific needs.
The GTF 250 RC took on the job of lowering the sidewalk on both sides of the Banzole tunnel along the A1 Panoramica on the northbound carriageway.