The GTF 600 RC is in action excavating tunnel number 3 (400 m in length) of the Ferrovie Appulo Lucane at the Modugno railway station.
The GTF 200 RC is at work on a major milling job on the A2 Naples-Salerno highway inside the Castello tunnel on the north carriageway.
The GTF 250 mounted on the new three-axle truck paired with the GTF 400 completed an important project on the A22 Modena Brennero. The job took place in the 420 m long Brenner tunnel, the last tunnel before the Italian-Austrian border.