MENU

News

SALERNO

November 13 2019

Roadheader at the Modugno tunnel

The GTF 600 RC is in action excavating tunnel number 3 (400 m in length) of the Ferrovie Appulo Lucane at the Modugno railway station.

SALERNO

October 29 2019

Salerno

The GTF 200 RC is at work on a major milling job on the A2 Naples-Salerno highway inside the Castello tunnel on the north carriageway.

SALERNO

September 22 2019

A winning duo scores at the Brenner Pass

The GTF 250 mounted on the new three-axle truck paired with the GTF 400 completed an important project on the A22 Modena Brennero. The job took place in the 420 m long Brenner tunnel, the last tunnel before the Italian-Austrian border.