MENU

GTF 250 RC protagonist of the Monte Barro tunnel

15 July 2022

Lecco

The GTF 250 RC performed milling of the base of the wall of the Monte Barro tunnel on the SS 36 near Lecco. The machine was used to finished the whole project including milling of the high part of the tunnel wall with the GTF 200.2.

Go back to news