MENU

Milling with traffic open

15 April 2021

SAVONA

A GTF 250 RC with special shield to inhibit dust generation enabled milling of 5 cm into the walls of the Bricco tunnel on the A6 Torino-Savona highway while allowing traffic in one lane.

The ability to perform the works one lane at a time was crucial for avoiding closing of the highway and any resulting traffic problems.

Go back to news