MENU

Deep structural cuts

15 March 2022

Tagli-strutturali

The GTF 400.2 RC and GTF 400 RC were deployed to make structural cuts inside the Citerna tunnel along the scenic route of the A1 highway in the direction of Florence. The machines took on the job of milling sections of the tunnel lining down 1 meter, the depth required to insert structural reinforcements. Despite the challenges, the machines and the GTF technology proved up to the task to complete the mission successfully.

Go back to news